-
2010-04-17
fef1735e578c6dba22d7089e4b8f53c438c5071b
27
Circle MRT line
1
/wiki/circle%20mrt%20line
Dhoby Ghaut
13
/wiki/dhoby%20ghaut%20mrt%20station
SMRT Trains Ltd
70
/wiki/smrt%20trains
Tai Seng
36
/wiki/tai%20seng%20mrt%20station
Circle MRT line
Dhoby Ghaut
SMRT Trains Ltd
Tai Seng
Circle MRT line
2014-11-19
94ba0aa30e0c1d022d4ceb9ad86d69ca6bc0b540
11
SMRT Trains Ltd
1
/feed/2014/11/19/the-bombardier-innovia-apm-100-c801as-entered-service-on-the-bukit-panjang-lrt-line-operated-by-smrt-trains-ltd
The Bombardier Innovia APM 100 C801As entered service on the Bukit Panjang LRT line, operated by SMRT Trains Ltd.
2012-01-14
87691fa5d735f235bdb2c421aaaf992123ad0c81
7
Circle MRT line
SMRT Trains Ltd
2
/feed/2012/01/14/the-circle-mrt-line-extension-began-operations-connecting-promenade-and-marina-bay-via-bayfront-it-is-operated-by-smrt
The Circle MRT line extension began operations, connecting Promenade and Marina Bay via Bayfront. It is operated by SMRT Trains Ltd.
/feed/2010/04/17/stages-1-and-2-of-circle-mrt-line-began-operations-with-all-11-stations-along-the-stage-1-and-2-of-the-mrt-line-from-dh
Stages 1 and 2 of Circle MRT line began operations, with all 11 stations along the Stage 1 and 2 of the MRT line from Dhoby Ghaut to Tai Seng being opened at the same time operated by SMRT Trains Ltd.